[Gatesedge] Fw: [Ansteorra] Gulf War Gate
lisabetta/kim
lisabetta at ansteorra.net
Sun Sep 15 16:02:05 PDT 2002
----- Original Message -----
From: "Ron Hardy" <rhemail at swbell.net>
To: "Ansteorra at Ansteorra.Org" <ansteorra at ansteorra.org>
Sent: Saturday, September 14, 2002 9:41 AM
Subject: [Ansteorra] Gulf War Gate
> Greetings this glorious Autumn day unto all the citizens of Mighty
> Ansteorra, from Master Fritz der Rothirsch,
>
> It is with some urgency that I write to you this day, in the matter of our
> Mighty Gulf Wars Gate. I sent to all the populace and your Barons a
missive
> some weeks ago describing the requirements for building this tribute to
> Ansteorra and seeking your commitments to make this dream of Kings a
> reality.
>
> I am happy to say that the Baronies of Stargate, Steppes, Bryn Gwlad,
> Bonwick and Bordermarch have all lain claim to a part of the building
> process. Their people stand ready to have their names forever etched in
the
> lore of Ansteorra by saying, "we built this for the glory of our Kingdom!"
> The Projects that have been taken up already are #'s 1, 6, 7, 8 and a
> Special Project not listed (see attached original missive, below).
>
> But what of the rest of you? There are many Projects for the Gate still
> left unclaimed. If the entire Gate does not get built, then all other
> effort is for naught. This undertaking is too grand to be left to a few
> willing souls; it will literally take the effort of every person in this
> Kingdom to make this Gate a reality, whether in time spent wielding hammer
> and saw, or by reaching into your purses to finance this project. Right
now
> what we need most urgently are the carpenters, welders, smiths and willing
> laborers to embrace this lofty goal and claim a section of the Ansteorran
> Gate as their own.
> We have heard from no Shires, Cantons, Strongholds or Keeps in this
matter.
> Remember, each Project will require only a handful of actual laborers, and
a
> short period of time to complete. Do not allow the size of your group to
> daunt your resolve. The Kingdom will reimburse all material expenses, and
> supervisory help is nearby. All you need are a few talented folks and
> plenty of heart.
>
> Act now! The DEADLINE for completion of each Project for the Gate is
> Christmas of this year! Remember, the Gate must be erected and in place
> BEFORE next Gulf Wars. Final assembly in Steppes, and the two trips to
> Meridies to erect the Gate will all take time as well. The crew who
erect
> the Gate on the Gulf Wars site will likely be traveling in February.
> Consider volunteering for this task, too. Again, the requirements are
> outlined below.
>
> Put the Ansteorran Gulf Wars Gate at the top of your group's next meeting
> agenda. Decide how you will contribute to this noble and grand
undertaking.
> Make the commitment now. Direct any questions you have to Master Fritz
> (contact info below).
> The glory of the Kingdom of Ansteorra will be reflected in the eyes of
all
> those who answer this call, and the admiration of Kings will be yours. I
> remain,
>
> In service to Ansteorra,
>
> HE Master Fritz der Rothirsch, Gate Architect
> rhemail at swbell.net
> 214-821-1223 (no calls after 9 pm)
>
>
> I am reposting the original message for those that may have missed it the
> first time.
>
>
> The Time to begin the Construction of the Great Gate of Ansteorra is
Here!!!
>
> The King has declared that a Mighty Gate shall be built in the lands of
> Meridies, on the battlefields of the great Gulf Wars. A Gate that will
> guard the camps of the Ansteorran Army when next and forever hence we ride
> into battle against the Trimarans and their allies. A Gate that will be a
> symbol of the might, strength and pride that is Ansteorra. The King has
> declared it shall be built, and so it shall be! Now is the time for all
> skilled carpenters, blacksmiths and strong laborers to come to the service
> of our Sovereign and make this dream a reality! On to Gulf Wars!
>
> It is necessary that this enormous undertaking be broken down into several
> large Projects, each to be accomplished by a skilled crew from various
> regions in our Kingdom. This Gate is to be the work of our entire
Kingdom,
> not just one, or even a few people. Each group is asked to recruit your
> best craftsmen in the construction skills, form a crew and take on one of
> the Projects described below. It is necessary that the leader of each
crew
> be skilled in the tasks your group volunteers for, and that the other
> crewmembers have a good working knowledge of the tasks required. The
> structural integrity of our Gate is of the utmost importance.
>
> Each group will be responsible for purchasing and picking up the needed
> materials (to be reimbursed upon presentation of valid receipts),
supplying
> their own tools, building their Project and possibly of transporting their
> completed Project to Steppes for final assembly. Detailed scaled plans
and
> elevations will be provided to you, and supervisors will be available to
> come to you to help get you started. Assistance by telephone will always
be
> available. DEADLINE for completion of your group's Project is Christmas
> 2002.
>
> Further, it will be necessary for a crew of six to eight skilled
> construction workers and strong laborers, plus one or two plucky persons
to
> serve as camp chatelaines, to travel to Meridies early in the year of 2003
> to prepare the ground and erect the Gate. This will be heavy labor. Two
> separate weekend trips will be required. Gas and food will be provided.
Be
> prepared to camp in the cold and wet.
>
> Please disseminate this information to your group and help recruit the
> talent needed to make this Gate a strong, beautiful reality. If you have
> any questions, please contact Master Fritz der Rothirsch at
> rhemail at swbell.net, or 214-821-1223 (before 9 pm).
>
>
> The various Projects are as follows:
>
> 1. Tower Construction: (Stargate)
> Two towers, octagonal and 7' diameter x 16' high. To be built in 8'
> sections. Wood framing and construction.
> SKILLS: Basic home construction carpentry (i.e. wall framing).
> TOOLS: Table saw, chop saw, pneumatic framing nailer (ideal).
> CREW: six people, 3 days.
>
> 2. Crenellations:
> Two Crenellations, octagonal, app. 9' diameter each. Built in sections.
> Wood framing.
> SKILLS: Cabinetmaker/carpenter
> TOOLS: Jigsaw, circular saw, pneumatic nail gun (ideal).
> CREW: four people, 2 days
>
> 3. Door Arch:
> One span, 12' long x 2' wide. Metal framing and wood facing, banded top
and
> bottom in steel.
> SKILLS: Framing carpentry, metalworking/welding.
> TOOLS: jigsaw, circular saw, oxy/acetylene rig, mig welder, 4" angle
> grinder
> CREW: 4 people, 3 days
>
> 4. Doors:
> Two doors, 6' wide x 12' high each, shaped to form a center arch.
Laminated
> up 2-by and plywood construction, cut to shape. Steel banding.
> SKILLS: basic carpentry, metalworking/welding
> TOOLS: jigsaw, circular saw, oxy/acetylene rig, mig welder, 4" angle
> grinder
> CREW: 4 people, 2 days
>
> 5. Tower Bases:
> Two bases, 7' diameter. 2 x 10 framing, to be set on piers.
> SKILLS: Carpentry (i.e. joist framing)
> TOOLS: circular saw, heavy-duty drill/screw gun
> CREW: 2 people, 2 days
>
> 6. Tower "Skins" (Bryn Gwlad)
> To cover both towers, provide a look of stone construction. Built of
> prefabricated textured sheet metal and plywood. The group that does this
pr
> object needs to be geographically near the group that builds tower framing
> (#1 above).
> SKILLS: light metal working, basic carpentry
> TOOLS: circular saw, tin snips
> CREW: 2 people, 2 days
>
>
> 7. Tower Storage Doors: (Bonwick)
> Two wooden doors to be set in back side of towers. Will provide storage
> access inside towers. 2' wide x 6' tall each.
> SKILLS: Basic carpentry
> TOOLS: circular saw, jigsaw
> CREW: 2 people, 1 day
>
> 8. Tower edging (Bordermarch)
> Strips of material will need to be cut into the outline of bricks using
> either a jig saw or
> router and template (preferred method).
> SKILLS: basic cutting or routing
> TOOLS: jigsaw or router capable of accepting collars
> CREW: 2 people, 1 day
>
> *SPECIAL PROJECTS *
> Construction of the Ansteorran Gate will be made more efficient with the
use
> of some highly specialized tools and skilled craftsmen to take on the
> following Special Projects:
>
>
> *Need someone with access to a sheet metal shear and 2 1/2 ' capacity
sheet
> metal brake. See #6 above. (Bryn Gwlad)
>
> *Also need someone with access to heavy-duty sheet metal brake to bend 8'
> lengths of 14-gauge steel into U-shape. (Bryn Gwlad)
>
> *Need a professional, highly skilled welder and assistant to weld frame
for
> doors and archway.
>
> *Need a good blacksmith to produce 175 rivets, 6" long made of 3/8" mild
> steel.
>
> *Need a highly skilled blacksmith to produce 4 small hinges, 2 lock
> mechanisms and 2 door handles for small storage doors on backs of towers.
>
>
> In service,
> Master Fritz der Rothirsch
> Baron of the Steppes
> Gate Architect
>
>
>
>
>
>
>
>
> _______________________________________________
> Ansteorra mailing list
> Ansteorra at ansteorra.org
> http://www.ansteorra.org/mailman/listinfo/ansteorra
>
More information about the Gatesedge
mailing list